In the workshop at present
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
Have been looking to move a bare metal bodyshell 60 miles back to the workshop and enquired with several vehicle transport companies about covered vehicle transport but the quotes were galactic (£500 +) - then enquired about a covered vehicle trailer but would also have to hire a tow vehicle - so lots of messing about collecting a tow vehicle from one hirer and the trailer form another but at half of the above price - then at the suggestion of one of my fellow Jowett members resolved the issue with this idea - Transit Luton box van with a tail lift - cost was £70 for the hire + £30 in fuel
- Attachments
-
- 20170206_123801_001.jpg (68.39 KiB) Viewed 2892 times
Last edited by Grumpy Northener on Tue Feb 07, 2017 8:18 am, edited 2 times in total.
1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
Re: In the workshop at present
How is the centre panel normally trimmed? I'm guessing that it's a treated canvas stretched over the frame, I just can't figure out how you then resolve the seam between it and the steel side sections.
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
Net result of the transport logistics in the previous post is that of this evening this is in the workshop - anyone remember it ? - Yes it's the early Jowett Javelin that has already seen a massive input from me - now virtually untouched for the last 3 years since we relocated to the country - it's time to get cracking with it - it needs to be in in paint before the end of March so here goes
- Attachments
-
- 20170206_184854.jpg (68.74 KiB) Viewed 2891 times
-
- 20170206_184836.jpg (62.53 KiB) Viewed 2891 times
-
- 20170206_184721.jpg (64.62 KiB) Viewed 2891 times
-
- 20170206_123752.jpg (90.69 KiB) Viewed 2891 times
1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
So there is a felt interlayer over the top of the wooden laths and the steel sections which in turn is covered by a outer waterproof hooding fabric this gets stretched across and tacked in where the steel sections terminate with the vertical sides of the van - the join on the sides / rear & above the doors is covered by a alloy 'J' section roof gutter trim - then across the front of the roof panel with a half moon shaped alloy trimHow is the centre panel normally trimmed? I'm guessing that it's a treated canvas stretched over the frame, I just can't figure out how you then resolve the seam between it and the steel side sections
1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
-
- Posts: 1141
- Joined: Sun Jan 23, 2011 11:54 am
Re: In the workshop at present
I take it the Javelin is going to be the centrepiece on the Jowett stand at the NEC this year? Must pop over and have a look between bouts of Matra fettling.
1974 Rover 2200 SC
1982 Matra Murena 1.6
1982 Matra Murena 1.6
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
Pete - It's certainly one of the cars on our stand along with a couple of others (all top secretI take it the Javelin is going to be the centrepiece on the Jowett stand at the NEC this year

1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
-
- Posts: 1141
- Joined: Sun Jan 23, 2011 11:54 am
Re: In the workshop at present
Stand 7-640. We're not allowed in to start setting up until 7 pm on the Thursday, which is a bit of a bummer.
1974 Rover 2200 SC
1982 Matra Murena 1.6
1982 Matra Murena 1.6
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
So got stuck in today - the shell has minor surface rust from being stood in storage (even though there was a dehumidifier running 24/7) - so spent much of the day with the DA sander with P80's discs & a rotary wire brush on the angle grinder in the difficult to access areas - just concentrated on the offside - still plenty to do on the inside / underside etc - but wanted to get the panels up to speed - straightened these up as required with a panel hammer & dolly prior to skimming with filler - I appreciate that most of the panels will have to be largely skimmed - it is the only way to get the minor deflection out of them - but it is only a skim - all body seams and larger areas of deflection have been lead loaded prior to applying the filler - the chassis tilter certainly makes an easy job of getting to the roof & underside
- Attachments
-
- 20170207_184648.jpg (60.91 KiB) Viewed 2857 times
-
- 20170207_140406.jpg (63.63 KiB) Viewed 2857 times
-
- 20170207_124205.jpg (70.81 KiB) Viewed 2857 times
-
- 20170207_124155.jpg (70.63 KiB) Viewed 2857 times
1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
Re: In the workshop at present
Thank you for the information on the roof construction. Nice to see the Javelin back in the workshop, I enjoyed reading your updates on that one.
- Grumpy Northener
- Posts: 1637
- Joined: Sun Apr 03, 2011 8:26 am
- Location: Hampshire UK
Re: In the workshop at present
Ok - We are on Stand 11-610 - don't know yet what time we can access the hall - sincerely hope that it's not 7pm has we have a 5 car stand with loads of setting up to doStand 7-640. We're not allowed in to start setting up until 7 pm on the Thursday

1937 Jowett 8 - Project - in less pieces than the Jupiter
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles
1943 Jowett Stationary Engine
1952 Jowett Jupiter - In lots of peices http://Jowett.org/
1952 Jowett Javelin - Largely original
1973 Rover P6 V8 - Original / 22,000 miles